WinDC delivers high-density, renewable-powered compute that helps enterprises cut cloud costs, reduce emissions and unlock reliable GPU capacity with sovereign control.

Up to 50% lower GPU-hour cost than hyperscaler cloud
Uptime, backed by 24/7 monitoring and SLAs
Scope 2 emissions at every site, verified with Grokens
From site assessment to live enterprise compute

Cloud costs are rising, GPU access is unpredictable and sustainability targets are tightening. Traditional data centres rely on congested urban grids, making it harder for enterprises to run growing AI and analytics workloads efficiently and responsibly.
The result:
GPU capacity priced in USD and billed at hyperscaler rates makes AI budgets hard to forecast and harder to justify.
Grid-powered compute adds Scope 2 emissions that work against your sustainability commitments.
Sensitive data and workloads often sit offshore, outside Australian jurisdiction.
GPU supply constraints and multi-year data centre builds hold back AI projects.
WinDC moves compute to the source of clean energy, so enterprises can run demanding workloads on high-density GPU infrastructure powered directly by renewables.
By bypassing grid congestion and using behind-the-meter energy, enterprises gain access to faster, cheaper, carbon-neutral compute with full sovereignty and real-time carbon verification.

Compute runs at solar, wind and hydro sites, drawing power directly at the source rather than through congested metro grids.
Factory-built ISO containerised modules are deployed in months, not years, and scale as your workloads grow.
Infrastructure is deployed on Australian soil and operated under Australian jurisdiction, so your data stays onshore.
Every workload is mapped to time-matched renewable generation, giving you audit-ready carbon reporting down to the GPU-hour.

Run AI and analytics workloads at a fraction of hyperscaler pricing by using renewable-powered compute built for efficiency.

Reduce your digital carbon footprint with workloads powered directly by renewables and verified down to the GPU-hour with Grokens.

Access high-density compute for training, inference, analytics and enterprise applications, without cloud supply constraints.

Keep your data, compute and carbon reporting within Australian jurisdiction for simpler compliance and governance.
WinDC is built for containerised and AI workloads that need performance and cost control more than Tier III overhead.
Serve production models and AI applications on dedicated GPU capacity at a predictable, lower cost per GPU-hour.
Train and fine-tune models on high-density, liquid-cooled GPU clusters without competing for hyperscaler supply.
Run large language models and AI tools on sensitive company data in a sovereign Australian environment, not a shared offshore cloud.
Process large datasets and analytics pipelines on renewable-powered infrastructure with real-time carbon visibility.
Move non-production environments off premium cloud tiers to cut cost while keeping production where it is.
Repatriate the GPU-heavy workloads driving your cloud bill to WinDC, and keep the rest of your cloud estate unchanged.
Modern AI and cloud-native workloads run in containerised environments that can fail over between sites. WinDC's Tier-0 model gives them a lower-cost, zero-emission home alongside your existing cloud.
| Hyperscaler cloud | WinDC Tier-0 compute | |
|---|---|---|
| Best suited to | Tier 1 production systems | Containerised workloads, AI inference and non-production |
| Compute cost | Premium GPU pricing in USD | Up to 50% lower total cost of ownership |
| Power and emissions | Grid mix and offsets, varies by region | 100% renewable at source, zero Scope 2 |
| Carbon reporting | RECs and offsets | Grokens, verified at GPU-hour level |
| Data location | Often offshore | Australian soil and jurisdiction |
| Hardware | Provider-defined | Hardware-agnostic: NVIDIA, AMD, Azure Local and edge platforms |
| Reliability | Provider SLAs | 99.5% uptime, N+1 power and cooling, 24/7 monitoring |
Run Tier 1 in AWS or Azure, and move non-production and inference workloads to WinDC Tier-0 for the cost and ESG advantage.
WinDC delivers measurable improvements in cost, carbon and compute efficiency, helping enterprises scale AI in a sustainable and financially responsible way.
Every WinDC workload generates Grokens: verifiable, audit-ready attestations that give your team and your stakeholders visibility over:
Tell us about your workloads, data requirements and sustainability targets.
We size GPU and CPU capacity, select a renewable site and agree service levels.
Factory-built modules are delivered and commissioned, ready for your workloads.
Add capacity as you grow, with Grokens carbon reporting from day one.
WinDC's renewable, behind-the-meter model is designed to deliver up to 50% lower GPU-hour cost and total cost of ownership than hyperscaler cloud. Actual savings depend on your workloads and capacity, so we model them as part of an assessment.
No. WinDC is designed as a Tier-0 complement to hyperscalers. Many enterprises keep Tier 1 production systems in AWS or Azure and move containerised, AI inference and non-production workloads to WinDC for cost and ESG advantages.
All WinDC infrastructure is deployed on Australian soil and operated under Australian jurisdiction, so data does not leave the country. This suits workloads subject to Australian privacy law and internal data governance policies.
Yes. You can run large language models and AI applications on your own data in a dedicated, sovereign Australian environment rather than a shared offshore cloud.
Compute is powered by renewable energy at the source, and Grokens map your usage to time-matched renewable generation at GPU-hour level, providing audit-ready records for ESG and Scope 2 reporting.
WinDC is hardware-agnostic, supporting NVIDIA and AMD GPUs, enterprise servers and networking, and compatibility with Azure Local and edge platforms.
WinDC is designed for 99.5% uptime with N+1 redundancy for power and cooling, automated failover, 24/7 monitoring and technical support, and SLA-governed service levels.
WinDC modules are factory-built and pre-configured, taking a deployment from site assessment to live compute in approximately 90 days.
See how renewable-powered infrastructure can transform your cost model and sustainability outcomes.