Build
Sovereign
AI
Capability
Powered
by
Renewable
Energy
WinDC transforms Australia’s renewable advantage into sovereign, zero-emission AI infrastructure that strengthens national capability, reduces grid pressure, and supports regional economic growth.
National
AI
Capability
Requires
More
Power,
More
Speed,
and
More
Sovereignty
Sovereign AI capability depends on secure, affordable, and scalable compute — yet grid stress, rising energy costs, and emissions constraints limit national capacity.

Meanwhile, digital infrastructure is concentrated in urban grids that are already strained, limiting sovereign control and slowing large-scale deployment.

The result:
Limited Sovereign Capacity
Growing Grid Pressure
Rising Energy Costs
Missed Opportunity for Regional Jobs
Sovereign
Renewable-Powered
Compute
That
Builds
National
Capability
WinDC converts Australia’s renewable abundance into AI-ready digital infrastructure by deploying modular, behind-the-meter compute units at clean energy sites.

This grid-friendly model provides sovereign control, reduces emissions, strengthens energy resilience, and creates new regional industries — all without adding stress to the existing grid.
Built
For
Government
And
Sovereign
Infrastructure
01
Strengthen Sovereign AI Capability
Build secure, locally controlled compute infrastructure powered by Australian renewables.
02
Grid-Friendly Deployment
Behind-the-meter design reduces strain on the grid and avoids costly transmission upgrades.
03
Zero-Emission Digital Infrastructure
Achieve national sustainability targets with compute powered directly by clean energy.
04
Regional Economic Growth
Create new jobs, attract investment, and build digital industries in renewable-rich regions.
National
Impact,
Delivered
Through
Clean
Energy
WinDC enables governments to convert renewable abundance into scalable, sovereign digital capacity that is cost-efficient, low-carbon, and regionally distributed.
Sovereign
Control of compute and energy
5,000–8,000
Regional jobs (national rollout potential)
Zero Scope 2
Emissions at every site
~90 day
Deployment per model

Partner With WinDC to Build Sovereign, Renewable-Powered AI Infrastructure

Support national capability, regional jobs, and clean digital infrastructure powered by Australia’s renewable advantage.